Concurrency Policies

When a scheduled run triggers while a previous run is still active, the concurrencyPolicy determines what happens. Choose the policy that matches your workflow's behavior: some workflows can overlap, others must not.


Why Concurrency Policies Matter

Consider a scheduled database backup that runs every hour. If a backup takes 90 minutes, the next scheduled run will trigger while the previous is still running. Without a concurrency policy:

  • Do both backups run simultaneously? (They might conflict)
  • Does the new backup wait? (It might fall further behind)
  • Does the new backup cancel the old? (Data might be lost)

The concurrency policy makes this behavior explicit. You decide what happens, and the system enforces it consistently.


Policy Options

spec:
  concurrencyPolicy: Forbid  # or Allow, Replace
Policy Behavior Use When
Allow Run concurrently (default) Workflows are independent
Forbid Skip new if previous running Overlap would cause conflicts
Replace Cancel previous, start new Only latest result matters

Allow: Concurrent Execution

spec:
  concurrencyPolicy: Allow
  schedule: "*/5 * * * *"

New runs start regardless of whether previous runs are active. This is the default and works when:

  • Workflows don't share resources
  • Each run produces independent results
  • Occasional overlap doesn't cause problems
gantt

%% Ghostty Hardcore Theme
    title Allow Policy
    dateFormat X
    axisFormat %s

    section Runs
    Run 1: a1, 0, 8
    Run 2: a2, 5, 8
    Run 3: a3, 10, 8

Runs overlap freely. With slow workflows and frequent schedules, you might have many running simultaneously.

Resource Exhaustion

Allow can exhaust cluster resources if workflows back up. Consider semaphores or resource quotas as additional protection.


Forbid: Skip on Overlap

spec:
  concurrencyPolicy: Forbid
  schedule: "*/5 * * * *"

New runs don't start while a previous run is active. The scheduled run is skipped entirely.

gantt

%% Ghostty Hardcore Theme
    title Forbid Policy
    dateFormat X
    axisFormat %s

    section Runs
    Run 1: a1, 0, 12
    Run 2 (skipped): crit, a2, 5, 0
    Run 3 (skipped): crit, a3, 10, 0
    Run 4: a4, 15, 8

Run 1 takes longer than the schedule interval, so runs 2 and 3 are skipped. Run 4 starts after run 1 completes.

Use Forbid when:

  • Concurrent runs would corrupt data
  • Skipping is better than overlapping
  • You'll investigate and fix slow runs

Replace: Cancel Previous

spec:
  concurrencyPolicy: Replace
  schedule: "*/5 * * * *"

When a new run triggers, any active run is cancelled and the new one starts.

gantt

%% Ghostty Hardcore Theme
    title Replace Policy
    dateFormat X
    axisFormat %s

    section Runs
    Run 1 (cancelled): crit, a1, 0, 5
    Run 2 (cancelled): crit, a2, 5, 5
    Run 3: a3, 10, 8

Each new scheduled time cancels the previous run and starts fresh.

Use Replace when:

  • Only the most recent data matters
  • Old runs become stale quickly
  • Partial completion is worthless

Work Loss

Replace discards work from cancelled runs. Use only when partial results have no value.


Combining with History Limits

Concurrency policy and history limits work together:

spec:
  concurrencyPolicy: Forbid
  successfulJobsHistoryLimit: 3
  failedJobsHistoryLimit: 1

The history limits control how many completed runs are retained:

  • successfulJobsHistoryLimit: 3 keeps the last 3 successful runs
  • failedJobsHistoryLimit: 1 keeps the last failed run

This provides debugging context while preventing unbounded growth.


Combining with Mutexes

CronWorkflow concurrency policy controls overlapping scheduled runs. Mutexes control access to shared resources across any workflows.

apiVersion: argoproj.io/v1alpha1
kind: CronWorkflow
spec:
  concurrencyPolicy: Forbid
  schedule: "0 * * * *"
  workflowSpec:
    synchronization:
      mutexes:
        - name: build-lock

This configuration:

  • concurrencyPolicy: Forbid prevents overlapping scheduled runs
  • mutexes prevents overlap with event-triggered runs of related workflows

Use both when scheduled and event-triggered workflows share resources.


Debugging Skipped Runs

With Forbid policy, skipped runs don't create workflow objects. Check CronWorkflow events to see what happened:

kubectl describe cronworkflow my-job -n argo-workflows

Look for events like "Skipping scheduled run because previous run is still active."

If runs are frequently skipped:

  1. Investigate why the previous run takes so long
  2. Adjust the schedule to match actual runtime
  3. Optimize the workflow to complete faster