Risk Assessment Matrix

Start by establishing baseline risk across three dimensions: impact, likelihood, and exploitability.

Assess All Three Dimensions

High impact with low likelihood is different risk than low impact with high likelihood. All three dimensions matter. Don't optimize for a single number.

Risk Dimensions

graph TB
    subgraph impact["Impact"]
        I1["Critical: Complete compromise<br/>of core functionality or data"]
        I2["High: Major degradation<br/>or data exposure"]
        I3["Medium: Reduced functionality<br/>or limited exposure"]
        I4["Low: Cosmetic or<br/>edge-case impact"]
    end

    subgraph likelihood["Likelihood"]
        L1["High: In active exploitation<br/>or easy to weaponize"]
        L2["Medium: Known attack path<br/>requires some effort"]
        L3["Low: Theoretical or requires<br/>specific conditions"]
        L4["Minimal: Requires multiple<br/>preconditions or user error"]
    end

    subgraph exploitability["Exploitability"]
        E1["Trivial: No authentication,<br/>network-adjacent"]
        E2["Low: Requires basic tools<br/>or public PoC"]
        E3["Medium: Requires custom work<br/>or insider knowledge"]
        E4["High: Requires zero-day or<br/>sophisticated attack"]
    end

    %% Ghostty Hardcore Theme
    style I1 fill:#f92572,color:#1b1d1e
    style I2 fill:#fd971e,color:#1b1d1e
    style I3 fill:#a6e22e,color:#1b1d1e
    style I4 fill:#66d9ef,color:#1b1d1e

    style L1 fill:#f92572,color:#1b1d1e
    style L2 fill:#fd971e,color:#1b1d1e
    style L3 fill:#a6e22e,color:#1b1d1e
    style L4 fill:#66d9ef,color:#1b1d1e

    style E1 fill:#f92572,color:#1b1d1e
    style E2 fill:#fd971e,color:#1b1d1e
    style E3 fill:#a6e22e,color:#1b1d1e
    style E4 fill:#66d9ef,color:#1b1d1e

Scoring Table

Factor 4 (Critical) 3 (High) 2 (Medium) 1 (Low)
Impact Complete system failure, auth bypass, data loss Major service degradation, sensitive data exposure Partial functionality loss, limited exposure Denial of service on rare path, information disclosure
Likelihood Active exploits in wild, trivial to execute Known exploitation path, tool availability Proof of concept exists, requires effort Theoretical only, multiple preconditions
Exploitability No auth, network-adjacent, <5 minute PoC Public PoC, basic tools needed Custom work required, insider knowledge Zero-day equivalent, extreme complexity

Risk Score Calculation

Risk Score = (Impact × Likelihood × Exploitability) / 27 × Blast Radius

Where:

  • Each factor: 1–4 points
  • Result: 1–64 before blast radius adjustment
  • Blast Radius: multiplier 0.2 to 5.0 based on affected systems

Risk Score Interpretation

Score Label Action
45+ CRITICAL Patch immediately, within 24 hours
30-44 HIGH Patch this sprint, within 1 week
15-29 MEDIUM Schedule for next planning cycle, within 30 days
5-14 LOW Plan for regular maintenance, no urgency
<5 MINIMAL Track, monitor, address opportunistically

References


Risk = Impact × Likelihood × Exploitability. Prioritize ruthlessly based on exposure.